This was a temporary terminus while the UR built the line into Portadown. There was a level crossing at the Dublin end of the station with a signal cabin on the Down side. There was previously a siding on the Up side serving a brickworks.
COPYRIGHT EWAN DUFFY 2010 - : ALL RIGHTS RESERVED. COPYRIGHT SUBSISTS IN THE CONTENT OF THIS PAGE. YOU MAY NOT SAVE A COPY OF THIS AND/OR REPRODUCE THIS IN ANY PUBLICATION AND/OR ON
ANY WEBSITE WITHOUT THE EXPRESS WRITTEN CONSENT OF EWAN DUFFY. STANDARD CHARGE FOR REPRODUCTION IS EUR100,000.00